Bid Opportunities/Contracts Awarded

 Description  Opening Date/Time  Closing Date/Time
Tooele City Hall Landscape Project
Accept bids for the renovation of the existing landscape to Tooele City Hall, which consists of the removal of approximately 7,500 square feet of sod, and the furnish and installation of drought tolerant landscape within the same area consisting of gravel mulch, river rock cobble and boulders; plantings and shrubs; concrete patio, walkway and landscape strips; pavers and base; picnic table and planter pots; a new irrigation system, complete, and related appurtenances all of which are part of the Tooele City Hall Landscape Project.
March 29, 2024 8:00 AM April 18, 2024 2:00 PM

1000 North 100 East Intersection Signal
Tooele City is requesting bids for the construction of the following Project: 1000 North 100 East Intersection Signal.
March 20, 2024 10:00 AM April 10, 2024 2:00 PM

2024 Roadway Maintenance Project
Notice is hereby given that Tooele City Corporation (Owner) will accept bids for the 2024 Roadway Maintenance Project consisting of approximately 1.53 million square feet of Type II Slurry Seal, 0.72 million square feet of Light Weight Aggregate Chip Seal, 19,500 square feet of asphalt overlay; and 1,200 linear feet of pavement striping, associated pavement markings, and parking lot striping.
February 27, 2024 8:00 AM March 20, 2024 2:00 PM

2024 Landscape Maintenance Project
The Project consists of providing lawn mowing and maintenance services on twenty five (25) separate park and public properties owned by Tooele City Corporation.
February 09, 2024 8:00 AM March 07, 2024 2:00 PM

2024 Droubay Road Widening Project
Work of this Construction Contract comprises the widening of Droubay Road between Vine Street and Smelter Streets.  The roadway is approximately 3,200 linear feet in length, and the project involves clearing and grubbing; removal and off-site disposal of the existing roadway asphalt, excavation and surplus earth materials; installation of approximately 6,350 linear feet of curb and gutter, 8,000 square feet of sidewalk, 3,250 linear feet of asphalt trail, 4,600 square feet of concrete block retaining wall, street lighting, storm drain inlets and related appurtenances.
February 08, 2024 5:00 PM March 13, 2024 2:00 PM

New Town Sewer Reline and Replacement Project
Work of this Construction Contract consists of three separate Bid Schedules.  See the attached for more information.
February 08, 2024 5:00 PM March 13, 2024 1:30 PM

CONTRACT AWARDED:  2024 Veterans Memorial Park Digital Sign
Creative Signs & Graphics
December 20, 2023 8:00 AM January 16, 2024 1:00 PM

CONTRACT AWARDED:  2023 Well House Concrete Generator Pads
Nelson & Sons, Inc.
August 16, 2023 8:00 AM August 30, 2023 11:00 AM

CONTRACT AWARDED:  Leitner-Poma Power and Sewer Realignment Project
Broken Arrow Construction
August 09, 2023 8:00 AM August 29, 2023 2:00 PM

CONTRACT AWARDED:  2023 Roadway Maintenance Project
Schedule A: American Pavement Preservation, LLC   
Schedule C: Peck Striping, Inc.
June 26, 2023 8:00 AM July 18, 2023 11:00 AM

CONTRACT AWARDED:  Southwest Drive Storm Drain Improvements
Broken Arrow Inc.
June 05, 2023 8:00 AM June 22, 2023 2:00 PM

CONTRACT AWARDED:  Restroom Building to be Constructed at Settlers Memorial Park
Achieve Contracting LLC
May 30, 2023 8:00 AM June 15, 2023 2:00 PM

CONTRACT AWARDED:  Tooele City Fire Station No. 3 - Addendum No 1
Big D Construction
May 08, 2023 5:00 PM June 01, 2023 2:00 PM

Berra Well House Fiber Project
Tooele City requires a fiber line to be ran from the Red Del Papa well house to 100 East Vine Street to connect into a fiber vault providing service to several locations.
April 07, 2023 5:00 PM April 28, 2023 2:30 PM

Contract Awarded: Pratt Aquatic Center Concrete Park Strip Project
Dave's Custom Concrete
April 06, 2023 8:00 AM April 20, 2023 2:00 PM

Contract Awarded: Iron Street Sewer Line & Manhole Replacement Project
PNL Construction, Inc.
March 22, 2023 12:00 PM April 11, 2023 2:00 PM

Invitation to Bid:  MDR System
MDR system to work in conjunction with our in-place computer infrastructure
March 08, 2023 8:00 AM March 30, 2023 2:30 PM

Contract Awarded: 2023 Roadway Reconstruction & Water Line Replacement Project
Kilgore Contracting
February 22, 2023 8:00 AM March 16, 2023 2:00 PM

Contract Awarded: Tooele WRF Headworks
Nelson Brothers Construction Company
February 10, 2023 8:00 AM March 16, 2023 11:00 AM

Contract Awarded: Recyclable Waste Processing
Waste Management of Utah, Inc.
January 24, 2023 8:00 AM February 02, 2023 2:00 PM

Contract Awarded: Vine Street Sidewalk Improvements
JSX, LLC
January 23, 2023 8:00 AM February 09, 2023 2:00 PM

Contract Awarded: Berra Well House and Booster Station
Vancon Inc.
September 14, 2022 8:00 AM September 29, 2022 2:00 PM

Contract Awarded: Berra Well House and Booster Station Rail Road Bore
Claude H. Nix Construction Company
September 14, 2022 8:00 AM September 29, 2022 2:00 PM

Bids/Contracts Awarded: England Acres Park and Trail Project
Broken Arrow Construction
August 19, 2022 8:00 AM September 08, 2022 2:00 PM

Bids/Contracts Awarded: Main Street/State Route-36 Parking
Beck Construction & Excavation
August 12, 2022 10:00 AM September 01, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Roadway Maintenance Project - Part 3 Chip Seal
August 03, 2022 8:00 AM August 23, 2022 2:00 PM

Bids/Contracts Awarded: Demolition of Abandoned PID Water Storage Tank
July 13, 2022 8:00 AM August 02, 2022 2:00 PM

Bids/Contracts Awarded: Berra Well House and Booster Station
Vancon Inc.
July 06, 2022 8:00 AM July 27, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Bulk Water Stand Pipe Project
July 01, 2022 8:00 AM July 20, 2022 2:00 PM

Bids/Contracts Awarded: WWT Upgrade - Course Screening Equipment Preprocurement
Huber Technology, Inc.
June 07, 2022 8:00 AM June 28, 2022 2:00 PM

Bids/Contracts Awarded: WWTP Upgrade - Grit Removal Equipment Preprocurement
Smith and Loveless, Inc.
June 07, 2022 8:00 AM June 28, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Roadway Improvement Project - Part 2
Morgan Pavement Maintenance
April 20, 2022 8:00 AM May 10, 2022 2:30 PM

Bids/Contracts Awarded: 2022 Vine Street Tree Removal Project
Sound Ground
April 06, 2022 8:00 AM April 22, 2022 11:00 AM

Bids/Contracts Awarded: Utah Avenue and Lodestone Way Intersection Signal Design
Cache Valley Electric
April 04, 2022 10:30 AM April 21, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Park Well House and Waterline Project
Broken Arrow Inc.
March 23, 2022 8:00 AM April 07, 2022 1:30 PM

Bids/Contracts Awarded: 2022 Seventh Street Road and Utility Improvement Project
Broken Arrow Inc.
March 16, 2022 8:00 AM May 10, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Berra 1 Million Gallon Reservoir
VanCon
March 16, 2022 8:00 AM April 05, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Roadway Reconstruction Project
Broken Arrow Inc.
March 16, 2022 8:00 AM April 05, 2022 2:00 PM

Bids/Contracts Awarded: 2022 Park Maintenance Project
Elite Grounds, L.C.
February 22, 2022 8:00 AM March 15, 2022 2:00 PM

Bids/Contracts Awarded: Tooele City Water Reclamation Facility - Filter Upgrade and Expansion
Whitaker Construction Company, Inc.
February 02, 2022 : February 23, 2022 2:00 PM

Bids/Contracts Awarded: Dow James Pressure Regulating Valve (PRV) and Meter Vault Project
Broken Arrow
January 31, 2022 8:00 AM February 15, 2022 2:00 PM

Bids/Contracts Awarded: Dow James Pressure Regulating Valve (PRV) and Meter Vault Project
Broken Arrow
January 31, 2022 8:00 AM February 15, 2022 2:00 PM

Bids/Contracts Awarded: Tooele City Parks Window and Door Replacement Project
Phils Glass, Inc.
November 22, 2021 8:00 AM December 09, 2021 2:00 PM

Bids/Contracts Awarded: Dow James Floor Project
Mountain Heights Flooring
October 28, 2021 8:00 AM November 18, 2021 2:00 PM

Bids/Contracts (NOT) Awarded:  2021 Sidewalk Replacement Project_August
August 27, 2021 4:30 PM September 14, 2021 3:00 PM

Bids/Contracts Awarded: Seventh Street Improvements and Middle Canyon Culvert
Broken Arrow, Inc.
August 03, 2021 8:00 AM August 24, 2021 2:00 PM

Bids/Contracts Awarded: Seventh Street Road Improvement Project (500 N to 600 N)
Withdrawn
July 19, 2021 8:00 AM August 10, 2021 2:00 PM

Bids/Contracts Awarded: England Acres park and Wigwam Pavilions
Pine Tree Construction
July 08, 2021 8:00 AM July 27, 2021 2:00 PM

Bids/Contracts Awarded: 2021 Water Reclamation Facility Upgrades
Nelson Brothers Construction Co.
May 26, 2021 : June 22, 2021 2:00 PM

Bids/Contracts Rescinded: 2021 Sidewalk Replacement Project
TB Construction – Rescinded
May 04, 2021 8:00 AM September 14, 2021 3:00 PM

Bids/Contracts Awarded: 2021 Sidewalk Replacement Project
T.B. Construction
May 04, 2021 8:00 AM May 20, 2021 2:00 PM

Bids/Contracts Awarded: Roadway Slurry Seal Project - Part 2
American Pavement Preservation
May 03, 2021 8:00 AM May 25, 2021 11:00 AM

Bids/Contracts Awarded: Removal and Replacement of the HVAC System for the Tooele City Youth Center
Cold Tech Refrigeration
April 27, 2021 8:00 AM May 18, 2021 2:00 PM

Bids/Contracts Awarded: Oquirrh Hills Golf Course Restroom Buildings
Christensen & Griffith Construction
April 23, 2021 8:00 AM May 13, 2021 2:00 PM

Bids/Contracts Awarded: Smelter Road Sidewalk Improvement Project
Beck Construction & Excavation, Inc.
April 22, 2021 8:00 AM May 11, 2021 11:00 AM

Bids/Contracts Awarded: 1000 West Reconstruction Project (Vine to 100 North)
Kilgore Contracting
April 09, 2021 8:00 AM May 04, 2021 2:00 PM

Bids/Contracts Awarded: Tooele WRF Filtration Upgrade Project
WesTech Engineering, Inc.
April 08, 2021 3:00 PM November 15, 2022 :

Bids/Contracts Awarded: Playground Equipment and Playground Enclosure at England Acres Park Phase 2IDS/CONTRACTS AWARDED
Sonntag Recreation LLC
March 09, 2021 8:00 AM March 31, 2021 2:00 PM

2021 Roadway Slurry Seal Project
Approximately 1.1 million square feet of existing roadway.
February 24, 2021 8:00 AM March 25, 2021 11:00 AM

Bids/Contracts Awarded: 2021 Roadway Slurry Seal Project
Asphalt Preservation
February 23, 2021 8:00 AM March 25, 2021 11:00 AM

Bids/Contracts Awarded: Vine Street Storm Drain Project
Broken Arrow
February 23, 2021 8:00 AM March 18, 2021 11:00 AM

Bids/Contracts Awarded: Skyline Roadway Improvement Project
Broken Arrow
February 23, 2021 8:00 AM March 18, 2021 1:00 PM

Bids/Contracts Awarded: Golf Course Pond #2 Expansion Project
February 22, 2021 8:00 AM March 10, 2021 2:00 PM

Bids/Contracts Awarded: Tooele City Pratt Aquatic Center - Pool Deck Drain Repair Project
CDC Restoration & Construction
November 05, 2020 8:00 AM November 20, 2020 2:00 PM

Bids/Contracts Awarded: Tooele City Pratt Aquatic Center - Locker Replacement Project
Midwest D-Vision Solutions, LLC
November 05, 2020 8:00 AM November 20, 2020 1:30 PM

Bids/Contracts Awarded: Tooele City Hall - Storefront Partitions and Key Card Access Project
R. H. Johnson Construction, Inc.
October 28, 2020 8:00 AM November 12, 2020 2:00 PM

Bids/Contracts Awarded: Abandonment of Well 9a
Widdison Turbine
October 13, 2020 8:00 AM October 27, 2020 2:00 PM

Bids/Contracts Awarded: Seventh Street Sidewalk Improvement Project
Acme Construction Inc
September 24, 2020 8:00 AM October 13, 2020 2:00 PM

Bids/Contracts Awarded: RFP - Playground Equipment at Rancho Tooele Park
September 22, 2020 8:00 AM October 06, 2020 2:00 PM

Bids/Contracts Awarded: 2020 Concrete Waterway Project
Beck Construction & Excavation, Inc.
April 17, 2020 8:00 AM April 30, 2020 2:00 PM

Bids/Contracts Awarded: Caldwell Sewer Line Replacement
  PNL Construction, Inc.
April 17, 2020 8:00 AM April 30, 2001 2:30 PM

Bids/Contracts Awarded: Well House 6 Reconstruction
JRock Construction, LLC.
April 10, 2020 8:00 AM April 28, 2020 2:00 PM

Bids/Contracts Awarded: 2020 Roadway Improvement Projects, Schedules A & B
Black Forest Paving
March 13, 2020 8:00 AM April 02, 2020 2:00 PM

Bids/Contracts Awarded: 2020 Roadway Improvement Projects, Schedule C
American Pavement Restoration
March 13, 2020 8:00 AM April 02, 2020 2:00 PM

Bids/Contracts Awarded: Notice of Used Heavy Equipment Sale
March 02, 2020 12:00 PM March 06, 2020 :

Bids/Contracts Awarded: 400 West Landscape Improvement Project
Jensen Family Landscape
February 17, 2020 8:00 AM March 09, 2020 3:00 PM

Bids/Contracts (NOT) Awarded: Purchase, Per Stick, Surplus Pipe
January 01, 2020 : May 29, 2020 2:30 PM

Bids/Contracts Awarded: Modified Elton Park Sidewalk Project
England Construction
October 15, 2019 8:00 AM November 04, 2019 3:00 PM

Bids/Contracts Awarded: Snow Plow Salt Rack
Christensen & Griffith
August 02, 2019 8:00 AM August 22, 2019 11:00 AM

Bids/Contracts (Not) Awarded: RFI - Transporting/Hauling Biosolids
July 19, 2019 8:00 AM July 31, 2019 1:00 PM

Bids/Contracts Awarded: Droubay Road Storm Drain Project (Vine Street to Smelter Road)
Broken Arrow Inc.
July 09, 2019 8:00 AM July 30, 2019 1:00 PM

Bids/Contracts Awarded: 2019 Concrete Waterway Project
July 03, 2019 8:00 AM July 30, 2019 11:30 AM

Bids/Contracts Awarded: Demolition of Obsolete Waste Water Treatment Facility
Impact Contractors Inc.
July 03, 2019 8:00 AM July 30, 2019 11:00 AM

Bids/Contract Awarded:  2019 Broadway Storm Drain Project
Broken Arrow Construction
May 31, 2019 5:00 PM June 19, 2019 2:00 PM

Bids/Contract Awarded:  2019 Demolition of Water Tanks
Impact Contractors
May 31, 2019 5:00 PM June 04, 2019 4:00 PM

Bids/Contracts Awarded: Broadway Storm Drain Project
Broken Arrow Inc.
May 28, 2019 8:00 AM June 12, 2019 2:00 PM

Bids/Contracts Awarded: 2019 Roadway Improvement Project
Kilgore Contracting
May 16, 2019 8:00 AM May 30, 2019 2:00 PM

Bids/Contracts Awarded: Demolition of Abandoned Water Storage Tanks No. 2 and 3IDS/CONTRACTS AWARDED
Impact Contractors Inc.
May 16, 2019 8:00 AM June 04, 2019 4:00 PM

Bids/Contracts Awarded: 2019 Water Improvement Project
Triex Construction Corporation
May 04, 2019 8:00 AM May 30, 2019 3:00 PM

Bids/Contracts Awarded: 2019 - 2022 Landscape Maintenance of Glen Eagles Park, Linear Park
Jensen Family Landscape
April 01, 2019 : April 15, 2019 4:00 PM

Bids/Contracts Awarded: Irrigation System at Elton Park
Landscaped Unlimited
March 11, 2019 8:00 AM April 01, 2019 4:00 PM

Bids/Contracts Awarded: Oquirrh Hills Golf Course Pavilion
Christensen & Griffith Construction Company (C&G)
February 22, 2019 8:00 AM March 08, 2019 3:00 PM

Bids/Contracts Awarded: City Parks Restroom Building
Broderick & Henderson
February 15, 2019 8:00 AM March 01, 2019 3:00 PM

Bids/Contracts Awarded:  2019 City Parks Restroom Building
Construction of a new 245 square foot, single story CMU restroom building.
February 15, 2019 9:00 AM March 01, 2019 3:00 PM

Bids/Contracts Awarded: Elton Park Pickleball Court
The Tennis & Track Company
January 30, 2019 8:00 AM February 15, 2019 3:00 PM

Bids/Contracts (NOT) Awarded: 400 West Landscape Improvement Project
January 01, 2019 : November 15, 2022 :

Bids/Contracts Awarded: 2018 Roadway Improvement Project, Bid Schedules A, B, and C
Kilgore Contracting
May 14, 2018 8:00 AM May 31, 2018 2:00 PM

Bids/Contracts Awarded: 2018 Roadway Improvement Project, Schedule D Slurry Seal
Intermountain Slurry Seal
May 14, 2018 8:00 AM May 31, 2018 2:00 PM

Bids/Contracts Awarded: Red Del Papa and Dow James Concession Buildings
England Construction
May 07, 2018 8:00 AM May 25, 2018 3:00 PM

Bids/Contracts Awarded: 2018 Water Improvement Project
Broken Arrow, Inc.
May 04, 2018 8:00 AM May 22, 2018 2:00 PM

Bids/Contracts Awarded: Drilling of the Fire Station Well
Hydro Resources Rocky Mountain, Inc.
February 22, 2018 8:00 AM March 13, 2018 2:00 PM

Bids/Contracts Awarded:100 East Storm Drain Project - Phase ll (Vine Street to 400 North)
Broken Arrow, Inc.
February 01, 2018 8:00 AM February 20, 2018 2:00 PM

Bids/Contracts Awarded: 2018-2021 Landscape Maintenance of England Acres, Elton Park, Oquirrh Field, Red Del Papa, Fire Station #2, and Youth Center
Turf-It
January 30, 2018 : February 16, 2018 4:00 PM

Bids/Contracts Awarded: 2018-2021 Landscape Maintenance of Dow James Park, Vine St. Park, Rancho Park, Veterans Park, City Library, Main St., and City Hall
Turf-It
January 30, 2018 : February 16, 2018 4:00 PM

Bids/Contracts Awarded: Construction Manager/General Contractor for the Tooele Public Safety Building
Big-D Construction
January 01, 2018 : January 01, 2018 :

Bids/Contracts Awarded: Dow James Ball Field Irrigation Renovation Project
Turf Sprinkler Company
October 26, 2017 8:00 AM November 06, 2017 4:00 PM

Bids/Contracts (NOT) Awarded: Red Del Papa Concession Building
June 14, 2017 8:00 AM June 27, 2017 11:00 AM

Bids/Contracts Awarded: 2017 Roadway Improvement Project
M&M Asphalt
May 31, 2017 8:00 AM June 20, 2017 2:00 PM

Bids/Contracts Awarded: 2017 Roadway Improvement Project
Kilgore Contracting
May 31, 2017 8:00 AM June 20, 2017 2:00 PM

Bids/Contracts Awarded: 2017 Water Improvement Project
KK&L Administration LLC
May 26, 2017 8:00 AM June 13, 2017 2:00 PM