Title 8. Chapter 7. Pump Stations
8-7-1. Sewage pump station areas.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
8-7-2. Withholding of approval.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
8-7-3. Pumping station areas.
(2) Based upon such studies, the POTW shall establish the pumping station areas and designate their confines in such manner as to enable land owners or users to determine whether or not they fall within the areas requiring sewage pumping stations.
(3) Including pumping station areas located outside the City limits in such studies shall not entitle those areas to sewer treatment by the POTW and shall not be interpreted to indicate the City’s desire to annex such areas or to take any other action.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
8-7-4. Construction of pumping stations.
(2) The construction of the pumping stations shall be of such size as the POTW may determine will be necessary to provide pumping to the entirety of a development project, including all phases, even though pending applications before it involve only a portion of a development project. All pump stations shall be planned, designed, and constructed in accordance with applicable State and local laws.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
8-7-5. Costs.
(2) The costs of construction shall be allocated among the land owners and/or users of the sewage pumping service area in the same proportion that the total of each land owner’s area bears to the total area of land situated within the pumping service area.
(3) The foregoing method of allocation of costs may be varied by action of the POTW when, in its judgment, it finds that unusual topography or other physical circumstances or the contemplated use or uses require a different method of allocating costs. If the pumping station is constructed prior to the filing of an application by a land owner or user, the costs of construction will be the actual costs expended. If the City constructs the pumping station, the City may assess pro rata costs for developments utilizing the pumping station capacity plus a reasonable administrative cost of 10%.
(4) If the pumping station has been constructed at the time the application is filed, then costs shall be the costs estimated by the City Engineer or which may be computed based upon contracts let to contractors or subcontractors to perform the construction. The estimated costs shall be used as the basis for establishing the amount of any payments required in advance until such time as construction is completed and actual costs are determined, at which time the costs shall be recomputed and allocated based upon the actual costs.
(5) Costs of operation and maintenance shall be allocated among the users of the sewage pumping service area.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
8-7-6. Method of payment.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
8-7-7. Property of POTW.
(Ord. 2015-17, June 3, 2015) (Ord. 1993-12, 09-20-1993)
Click Here for a .pdf copy of Title8 Chapter7
Please Note: Every attempt has been made to keep this online Tooele City Code up-to-date; however, there may be discrepancies between this online code and that which is actually adopted. If you have questions about the Tooele City Code or for the most recent update, please call (435) 843-2120 or email attorney@tooelecity.org.